More single tracking after 23 years? No rather the bridge was being replaced to raise the clearance on US 202 & MA 10 from 11'5" to at least 14'. They rebuilt track 2 first and then #1. The tracks are about 3 to four feet higher through here. |
Date:
12/6/2008 |
Location:
Westfield, MA Map  |
Views:
98 |
Collection Of:

Bob Beaumont |
|
Author: Bob Beaumont
|
 |
Picture Categories: Bridge,Track |
This picture is part of album: CSX: BOSTON LINE |